Structural steel at a food-processing plant
A 70-foot support I-beam plus the railings and supports beneath a walkway. The old primer had failed and the steel underneath was pitted. The crew worked from a scissor lift in full PPE, took the corrosion back to sound metal, and prepped and primed the run for inspection, with the topcoat as the next stage. The full write-up is on the steel rust removal and recoating page.